Master Plan and Other Project

120,000 Topographic survey Soil investigation and laboratory testing 8 Dong Hoi port detailed master plan project Nghe An PC 30/08/2010 03/03/2011 200,000 Topographic and bathymetric survey Soil Investigation and laboratory testing Detailed master plan Legal procedure and approval of detailed master plan 9 Nghi Son 1 Thermal Power Plant Project Toa Corporation (Japan) 30/10/2010 02/2013…

Breakwater and Waterway Project

No.  Project Name Project Owner or Employer Execution date Consulting services  value (USD) Supplied consulting services Commenced date Completed date 1 Hau River Access channel Project Vinawaco 23/11/2009 23/12/2009 100,000 Detailed Design for dredging work 2 Cua Lo port access channel Project Marine 3 PMU (Vinamarine) 02/01/2010 02/03/2010 80,000 Topographic and Bathymetric survey Soil investigation…

Shipyard Project

No. Project Name Project Owner or Employer Execution date Consulting services value (USD) Supplied consulting services Commenced date Completed date 1 Nosco-Vinaline Shipyard Project Vinalines 25/01/2008 To the present 400,000 Topographic and Bathymetric survey Hydraulic survey Soil Investigation and Laboratory testing Investment Study Report and Basic design Detailed design 2 Oshima Shipbuilding project in Cam Ranh,…

Port Project

No. Project Name Project Owner or Employer Execution date Consulting services value (USD) Supplied consulting services Commenced date Completed date 1 Nghi Son General Terminal Project of Vietnam Coal and Mineral Corporation Vietnam Coal and Mineral Corporation 14/01/2008 14/05/2008 100,000 Topographic and Bathymetric survey; Soil Investigation and laboratory testing Preparing Investment Study report 2 Lach Huyen…

Thermal Power Plant Project

No. Projects Outline Year 1 Survey for detailed design of Pha Lai Thermal Power Plant Stage 2 Establishing Horizontal and Vertical control points Topographic and Bathymetric survey Soil Investigation Laboratory test 2003 2 Survey and Feasibility Study on Vung Ang Thermal Power Plant Project Port system Access Road Dredging channel and Turning area Port Facilities…

Waterway Project

No. Projects Outline Year 1 Survey, Feasibility study and detailed design for sand protection bank of Access channel to Cua Lo port Project 500 m of sand protection bank Buoy Navigation Aid system on the channel 2003 2 Data collection, Topo-Bathymetric survey, Hydrographic survey, soil investigation, Mathematical – Physical Modeling and Detailed Design of Do…