No. | Projects | Outline | Year |
1 | Survey for detailed design of Pha Lai Thermal Power Plant Stage 2 | Establishing Horizontal and Vertical control points
Topographic and Bathymetric survey Soil Investigation Laboratory test |
2003 |
2 | Survey and Feasibility Study on Vung Ang Thermal Power Plant Project | Port system
Access Road Dredging channel and Turning area Port Facilities |
2005 |
3 | Survey and Detailed Deisign of O Mon Thermal Power Plant | 3 berth (1 berth for 10,000 DWT vessel, 1 berth for Gysum and Coal
Dredging channel |
2006 |
4 | Survey and Feasibility Study on Mong Duong Thermal Power Plant | 2 berth for coal and Gypsum
Dredging channel |
2006 |