120,000 Topographic survey

Soil investigation and laboratory testing

8 Dong Hoi port detailed master plan project Nghe An PC 30/08/2010 03/03/2011 200,000 Topographic and bathymetric survey

Soil Investigation and laboratory testing

Detailed master plan

Legal procedure and approval of detailed master plan

9 Nghi Son 1 Thermal Power Plant Project Toa Corporation (Japan) 30/10/2010 02/2013 250,000 Topographic and bathymetric survey

Soil investigation and laboratory testing

Review basic design and development of detailed design

Legal procedure and approval of berthing line and appraisal of design document and construction permit

10 Kokelco Iron Nugget Vietnam Phase – 1 Project Kobe Steel Group (Japan) 26/04/2011 03/2012 350,000 Topographic and bathymetric survey

Hydraulic survey

Soil investigation and laboratory testing

11 Dung Quat port Master plan 1/2000 project Dung Quat Economic Zone Authority (DEZA) 12/8/2011 Under process 167,000 Topographic and bathymetric survey

Soil investigation and laboratory testing

Master plan

12 Master plan of Cam Pha General Port Project Viancomin – Campha Port and Logistics 21/02/2012 Under process 140,000 Master plan

Topographic survey

13 Exteding Cai Lan Oil and Gas Terminal Phase II Project Petro Vietnam Oil Corporation 22/02/2012 09/2012 90,000 Topographic survey

FS and Detail design