120,000 | Topographic survey
Soil investigation and laboratory testing |
|||||
8 | Dong Hoi port detailed master plan project | Nghe An PC | 30/08/2010 | 03/03/2011 | 200,000 | Topographic and bathymetric survey
Soil Investigation and laboratory testing Detailed master plan Legal procedure and approval of detailed master plan |
9 | Nghi Son 1 Thermal Power Plant Project | Toa Corporation (Japan) | 30/10/2010 | 02/2013 | 250,000 | Topographic and bathymetric survey
Soil investigation and laboratory testing Review basic design and development of detailed design Legal procedure and approval of berthing line and appraisal of design document and construction permit |
10 | Kokelco Iron Nugget Vietnam Phase – 1 Project | Kobe Steel Group (Japan) | 26/04/2011 | 03/2012 | 350,000 | Topographic and bathymetric survey
Hydraulic survey Soil investigation and laboratory testing |
11 | Dung Quat port Master plan 1/2000 project | Dung Quat Economic Zone Authority (DEZA) | 12/8/2011 | Under process | 167,000 | Topographic and bathymetric survey
Soil investigation and laboratory testing Master plan |
12 | Master plan of Cam Pha General Port Project | Viancomin – Campha Port and Logistics | 21/02/2012 | Under process | 140,000 | Master plan
Topographic survey |
13 | Exteding Cai Lan Oil and Gas Terminal Phase II Project | Petro Vietnam Oil Corporation | 22/02/2012 | 09/2012 | 90,000 | Topographic survey
FS and Detail design |