1 | Survey, Basic Design and Detailed Design for Expansion of Vung Ang Port Project – Phase 2 | 1 berth of Quaywall for 15,000 DWT vessel
Dredging of Access Channel |
2003 |
2 | Survey, Basic Design and Detailed Design for Expansion of Cam Pha Port Project | 1 berth of Quaywall for 70,000 DWT vessel
Dredging of Access Channel |
2004 |
3 | Survey, Basic Design, Detailed Design and construction supervision for Nghi Son port construction Project | 3 General berth for 10,000 DWT – 30,000 DWT vessel
300 m breakwater Dredging of Access Channel Access Road Port Facilities |
2004 |
4 | Survey, Basic Design, Detailed Design for construction of Ky Ha Port Project | 2 berth for 5,000 DWT-10,000DWT vessel
Dredging of access channel Power Supply, Water supply Port Facilities Seismic survey and Sub-bottom profiling |
2003
2004 |
5 | Survey, Feasibility Study for Thi Nai port Project | 1 berth for 5,000 DWT vessel
Dredging of access channel and basin turning area Port Facilities |
2004 |
6 | Survey and associated with JICA in basic design for construction of Cai Mep – Thi Vai Terminal Project | 2 container berth for 50,000DWT at upper Cai Mep
4 container berths for 50,000 DWT and 2 container berths for 80,000 DWT at Lower Cai Mep
|
2004 |
7 | Survey and associated with Nippon Koei (Japan) in Basic design, detailed design and construction supervision for Hai Phong port Rehabilitation Project Phase 2 | 1 container berth for 30,000 DWT vessel
Operate of 42 km of new channel Revetment and Embankment system on Cam River and Bach Dang River |
2004
2005 |
8 | Survey and associated with Nippon Koei (Japan) in Feasibility Study, Basic Design and Detailed Design and construction supervision for Cai Lan port Expansion Project | 7 container berth for 10,000 DWT – 50,000 DWT vessel
Dredging of access channel Port facilities |
2000 to
2006 |
9 | Survey and associated with JPC (Japan) in feasibility study, basic design and detailed design and construction supervision for Da Nang port Improvement Project | 3 container berth for 30,000 DWT vessel
4 bridges on Trang river Access Road Access Channel Port Facilities |
2000 to 2006 |
10 | Survey, feasibility study, basic design and detailed design for expansion of Chan May port Project | 03 berths for 30,000 DWT vessel
Inner road and yard system Access channel Breakwater Port facilities |
2000 to 2006 |
11 | Survey, Feasibility Study on Berth No.1of Dung Quat port project | 1 berth for 30,000 DWT vessel
Dredging channel Port facilities |
2006 |
12 | Survey and detailed design of Berth No.3 of Dung Quats port Project | 1 berth for 50,000 DWT vessel
Dredging channel Port facilities |
2006 |
13 | Survey and Feasibility study on Ben Got – Lach Huyen Deep sea port project | 1 berth for 100,000 DWT vessel
New access channel Bridges and Embankment network Port facilities |
2006 |