| No. | Project Name | Project Owner or Employer | Execution date | Consulting services value (USD) | Supplied consulting services | |
| Commenced date | Completed date | |||||
| 1 | Nghi Son General Terminal Project of Vietnam Coal and Mineral Corporation | Vietnam Coal and Mineral Corporation | 14/01/2008 | 14/05/2008 | 100,000 | Topographic and Bathymetric survey;
Soil Investigation and laboratory testing Preparing Investment Study report |
| 2 | Lach Huyen International Gateway port Project (SOC) | Daewoo – Project Owner;
Handong – Employer |
15/01/2008 | 15/04/2008 | 100,000 | Data collection
Topographic and Bathymetric survey Soil investigation and Laboratory testing |
| 3 | Cat Lai General Terminal Project | International Transport Joint Stock Company | 14/01/2008 | 14/04/2008 | 200,000 | Topographic and Bathymetric survey
Soil Investigation and laboratory testing Investment Study Report Detailed Design |
| 4 | Cai Mep Container International Terminal (CMIT) | Handong E&C (Korea) | 26/05/2008 | 26/12/2008 | 278,000 | Detailed Design of Marine work |
| 5 | Binh Thuan Vinacomin port project | Vietnam Coal and Mineral Corporation (Vinacomin) | 22/08/2008 | 22/01/2009 | 300,000 | Topographic and Bathymetric survey
Soil investigation and laboratory testing Investment Study Report and basic design |
| 6 | Nam Dinh Vu Investment Construction Project | Nam Dinh Vu Economic Zone (Hai Phong PC) | 25/09/2009 | 15/04/2010 | 300,000 | Topographic and Bathymetric survey
Soil Investigation and laboratory testing Detailed master plan Investment Study report Legal procedure and approval of detailed master plan and investment study report |
| 7 | Long An Capital port Project | Vinacapital | 10/09/2009 | 10/12/2009 | 100,000 | Topographic and Bathymetric survey
Soil Investigation and laboratory testing Basic design Legal procedure and approval for berthing line |
| 8 | Lach Huyen Port Infrastructure Construction Project (Saparof Stage) | JICA Study Team | 3/11/2009 | 3/3/2010 | 350,000 | Topographic and Bathymetric survey
Soil Investigation and laboratory testing Hydraulic survey |
| 9 | Phuoc Long 3 Container Terminal Project | Truong Tho Transport Service Joint Stock Company | 24/12/2009 | 24/04/2010 | 120,000 | Topographic and Bathymetric survey
Soil Investigation and laboratory testing Detailed Design |
| 10 | Berth No.3 of Nghi Son port project | Nghi Son Petroleum Investment and Trademark JSC | 06/09/2010 | 06/12/2010 | 250,000 | Topographic and Bathymetric survey
Soil investigation and laboratory testing Investment Study and basic design Detailed design Legal Procedure and approval of berthing line |
| 11 | Phu Dong International Container Terminal | Phu Dong International Container Terminal JSC | 09/2010 | 05/2012 | 200,000 | Topographic and bathymetric survey
Soil investigation and laboratory testing Master plan Investment Study Report and basic design Legal procedure and approval of master plan and berthing line and investment certificate |
| 12 | Lach Huyen Port Infrastructure Construction Project (Detailed Design Stage) | JICA Study Team | 4/4/2011 | 01/2013 | 2,000,000 | Topographic and bathymetric survey
Soil investigation and laboratory testing Providing consulting experts Preparation of basic design, detailed design and tender drawings |
| 13 | Port Group at Km6 Cam Pha – Quang Ninh | Vietnam Coal and Mineral Corporation (Vinacomin) | 24/05/2011 | 12/2012 | 115,000 | Topographic and bathymetric survey
Soil investigation and laboratory testing Investment study report and basic design |
| 14 | Nghi Son Iron and Steel International General Terminal | Nghi Son Iron and Steel Joint Stock Company | 7/11/2011 | Under process | 144,000 | Topographic and bathymetric survey
Soil investigation and laboratory testing FS and Detail design |