No.                                          Projects                                      Outline             Year
1 Survey, Mathematical modeling for Feasibility Study on Ghenh Bridge station: Km88+600 of 4B National road Topographic and bathymetric survey

Hydrological survey

Cross section survey

Mathematical modeling

2003
2 Survey for Feasibility Study and Detailed design of Lang – Hoa Lac Highway Project (Station: 15+540 -22+100 Topographic survey

Cross section and Longitudinal survey

Geotechnical investigation

2003
3 Survey and Construction supervision for Binh Bridge construction Project Establishing Horizontal and vertical control points

Construction supervision

2004
4 Survey for Feasibility Study on South of Hau River Highway Construction Project Establishing Horizontal and Vertical control points 2005
5 Survey for Feasibility Study on National Highway No.38, No.39, No.21 and WB National Road Improvement Project Establishing Horizontal and Vertical control points 2005
6 Survey and Mathematical Modeling for Phu Dong 2 Bridge Construction Project Collection data

Topographic and bathymetric survey

Hydrological survey

Mathematic modeling

2005
7 Survey for Technical Design of Cau Gie – Ninh Binh Highway Construction Project Stage 1 Establishing Horizontal and Vertical control points

Cross section and Longitudinal survey

Soil Investigation

Laboratory test

2005
8 Survey for Feasibility Study on Hanoi – Haiphong National Highway Project Establishing Horizontal and Vertical control points 2005
9 Survey for Feasibility Study on Trung Luong – My Thuan National Highway Project Establishing Horizontal and Vertical control points 2005
10 Survey for Feasibility Study on Highway No.1 Expansion Project Establishing Horizontal and Vertical control points 2005
11 Survey for Feasibility Study on Highway No.5 Extension Project Establishing Horizontal and Vertical control points 2005
12 Survey for Feasibility Study on No.4 Corridor Road system Project Topographic survey

Hydrological survey

2005
13 Survey and Mathematical modeling for feasibility study on Vinh Tuy Bridge Conctruction Project Topographic and Bathymetric survey

Hydrological survey

Mathematical modeling

2005
14 Survey and Mathematical modeling for feasibility study on Nhat Tan Bridge Construction Project Topographic and Bathymetric survey

Hydrological survey

Mathematical modeling

2005